---
title: "Electrical Trade"
canonical: https://www.m-i-n-d.ai/minds/electrical
jurisdiction: "US Federal + State · OSHA 1910.269/1926K"
last_verified: 2026-08-25
license: CC BY 4.0 — https://creativecommons.org/licenses/by/4.0/
attribution: "Source: MIND (m-i-n-d.ai)"
---

# Electrical Trade

> US electrical worker and contractor safety compliance: OSHA general industry electrical safety-related work practices under 29 CFR 1910.269, construction electrical requirements under 29 CFR 1926 Subpart K, NIOSH electrical hazard alerts, and state OSHA-plan amendments — grounded exclusively in OSHA.gov, NIOSH, and state plan regulatory text. NFPA 70 (National Electrical Code) is licensed content, referenced by article number only, never reproduced.

## Lockout/Tagout & Arc Flash

- [When is lockout/tagout required for electrical work, and what does OSHA require?](https://www.m-i-n-d.ai/minds/electrical/lockout-tagout-required-electrical-work) — as of 2026-08-25
