What payment and interoperability rules apply to federally funded EV chargers? Answer in under 100 words. Cite only eCFR (www.ecfr.gov) sources.
Details / How it works
Under 23 CFR § 680.106 (2023), unless charging is permanently free, every federally funded station must (1) provide a contactless payment method accepting major debit/credit cards and either an automated toll-free number or SMS to start a session and submit payment; (2) not require membership; (3) not delay, limit, or curtail power flow based on payment method or membership; and (4) provide access for limited-English-proficient users and people with disabilities, with toll-free and SMS options clearly identifying payment access. Equipment must be certified by an OSHA Nationally Recognized Testing Laboratory, all AC Level 2 chargers must be ENERGY STAR certified, and DCFC and AC Level 2 chargers should be certified to the appropriate UL standards for EV charging system equipment.
Numbers & thresholds
| Requirement | Threshold |
|---|---|
| Minimum payment methods (unless free) | Contactless debit/credit + (automated toll-free phone OR SMS) |
| AC Level 2 charger certification | ENERGY STAR (mandatory) |
| DCFC power per port (AFC locations) | ≥ 150 kW continuous, 250–920 V DC |
| AC Level 2 power per port | ≥ 6 kW continuous, J1772 connector |
| Minimum charging ports per station | 4 (DCFC at AFCs; DCFC and/or AC Level 2 elsewhere) |
| Connector standard for DCFC | CCS Type 1 (mandatory); CHAdeMO allowed only with FY2022 NEVI Funds |
| Connector standard for AC Level 2 | J1772 |
| Equipment testing lab | OSHA Nationally Recognized Testing Laboratory |
| Long-term stewardship | ≥ 5 years from initial operation |
Exceptions & edge cases
CHAdeMO connectors may be provided at DCFC charging ports only when funded with FY2022 NEVI Funds; other federal funds cannot be used for CHAdeMO. Charging stations not on a designated Alternative Fuel Corridor need only be accessible during the site host's business operating hours, while AFC-sited stations must be available 24/7. Isolated or temporary interruptions from maintenance, repairs, vandalism, natural disasters, electric utility service interruptions, or scheduled maintenance are excluded from the § 680.116 uptime calculation.
Sources
- [1]U.S. Government Publishing Office / Federal Highway Administration — 23 CFR 680.106 — Interoperability, payment and reliability requirements for EV charging infrastructure · as of 2026-08-28
- [2]U.S. Government Publishing Office / Federal Highway Administration — 23 CFR 680.116 — Data submittal requirements for federally funded EV charging stations · as of 2026-08-28
- [3]U.S. Government Publishing Office / Federal Highway Administration — 23 CFR 680.104 — Installation, operation and maintenance standards for federally funded EV chargers · as of 2026-08-28
Ask this MIND
This answer is static and source-locked. Ask EV & Charging your version of this question.
Related questions
This page is one mind’s knowledge, published.
MIND turns your documents into a queryable, citable knowledge graph.
Make your own MIND →